Yayu Fertilizer Plant Access Road Project

The project covers a total length of 38.6km which comprised the under listed activities at a Total Cost of ETB 138,293,010.14:

Ø  One Major Drainage Structure

Ø  Four Slab Culverts

Ø  Eight Pipe Culverts

Ø  650m3 of Masonry Retaining Wall

Bole – Lemi Industrial Zone Access Road Project

The project covers a total length of 11km which comprised the under listed activities at a Total Cost of ETB 109,082,501.43:

Ø  Asphalt Work

Ø  Base Course

Ø  Sub base

Ø  Earthwork activities

Ø  Drainage Works 

Abala - Shaigubi Asphalt Road Project

which comprised the under listed activities and work volume at a Total Cost of ETB 124,590,641.00:

Ø  Clearing and Grubbing- 54 Ha

Ø  Common Excavation to Embankment-more than 550,000.00 cum

Ø  Common Excavation to Waste- more than 450,000.00 cum

Ø  Rock Excavation to Waste- more than 35,000.00 cum

Ø  Selected Backfill- more than 150,000.00 cum

Ø  Different Minor Drainage works, which includes Slab Culverts, Pipe Culverts and Retaining Walls

Ø  Sub base Works- 108,000.00 cum